Quality & Schedule Management

section-e9a4d85

Quality & Schedule Management

Quality First:

Viet Chuan has invested heavily in Total Quality Management system. The quality of mold is well managed from Purchase-Design-Production to Finising process Our technical staff has in-depth knowledge to provision and prevent quality issues to ensure products released with perfect condition and meet customer expectations.
During mold development process, Plastic Injection Production Engineering staff, Mold Designer, and Mold production work as a team to determine key points to ensure that mold will be up to standard so mass production can be implemented reliably and stably.
Design quality ensure: a meeting with teams of Plastic Injection Production Engineering staff, Mold Designer and Mold production will be held to verify the Design value and reduce redundant process.
Processing quality management: From CNC, EDM, WC, Electrode process to Finishing, Polishing process, quality check is implemented consecutively
Mold quality check before each try: Engineering Control Department in charge of verifying the mold quality before injection
Mold Quality Control Inspection: After try, sample will be inspected by QC and then issue a QC report with 5 Why analysis to prevent future NG issue.
Production Quality Control: In mass production, PQC is in charge of checking Input material quality, In-Process quality, and output quality to ensure that all products are meeting customer quality requirement.